Skip to content

About

Kyeong Sun Kim · born 1993-06-10 · INTJ · PhD candidate in civil engineering at Seoul National University · defense 2026-09-03.

Researches scour assessment of offshore wind turbine tripod suction bucket foundations. Publishes open-source software alongside every paper. Tracks both the research and the body under the same Blueprint-inspired quarterly protocol. Second in his high-school graduating class. Eighth of 120 at the UC Berkeley tennis-club try-out.


Life timeline · 1993 → 2026

Mermaid gantts are linear-time by design — a true log-scale time axis isn't natively supported. The timeline is split in two below to approximate the "log" effect: the first chart covers 26 years (1993 → 2019) at 2-year ticks; the second covers 6 years (2020 → 2026) at 6-month ticks, so the recent, densest era gets roughly 8× more horizontal resolution per year.

1993 → 2021 · childhood · athletics · Berkeley · service + bridge

%%{init: {"theme":"base","themeVariables":{"fontSize":"16px","fontFamily":"Inter, system-ui, -apple-system, sans-serif","gantt":{"sectionFontSize":"18px","taskFontSize":"16px"}},"gantt":{"barHeight":28,"barGap":8,"leftPadding":240,"rightPadding":40,"topPadding":50,"bottomPadding":30,"sectionFontSize":18,"topAxis":true}}}%%
gantt
    title Early life · 1993 → 2021
    dateFormat YYYY-MM-DD
    axisFormat %Y
    tickInterval 2year

    section Origins
    ★ Born · Republic of Korea                                     :milestone, 1993-06-10, 0d
    First recallable memory (age 4)                                :milestone, 1997-06-10, 0d
    Recommended for gifted education (5th grade)                   :milestone, 2005-04-01, 0d
    Study abroad · Canada                                          :sac, 2006-08-01, 1y
    ★ Study abroad · USA                                           :sau, 2007-08-01, 2192d

    section Athletics
    Started bodybuilding + tennis                                  :bb, 2008-03-01, 17y
    USTA Regency Junior Open Boys 18s · 2nd                        :milestone, 2010-07-15, 0d
    STVA Tennis Tournament · 3rd                                   :milestone, 2010-10-01, 0d
    VISAA Tennis League · 2nd                                      :milestone, 2011-05-15, 0d
    USTA Tennis Ranking · Virginia · #30                           :milestone, 2012-06-01, 0d
    Oakland Kungfu Academy                                         :kungfu, 2013-09-01, 2y

    section Academic + competitions
    American Math Competitions · 3rd                               :milestone, 2011-11-01, 0d
    ★ Enrolled UC Berkeley · Civil Engineering                     :active, bsenr, 2012-08-20, 1583d
    UC Berkeley Tennis Club try-out · 8th of 120                   :milestone, 2013-09-01, 0d
    Concrete-lab research assistant                                :cla, 2014-01-15, 180d
    Started reading Wikipedia systematically                       :milestone, 2014-01-15, 0d
    ASCE Concrete Canoe Competition · 3rd                          :milestone, 2015-04-15, 0d
    Samsung Cup · Cal vs Stanford · 3rd                            :milestone, 2015-11-01, 0d
    ★ BS Civil Engineering · UC Berkeley                           :milestone, 2016-12-20, 0d

    section Service + bridge
    ★ Military service · ROK Special Forces                        :active, mil, 2017-06-01, 2019-09-30
    ★ Moscow University                                            :active, msu, 2019-09-15, 2021-01-31
    Chess rating · 2000                                            :milestone, 2020-05-01, 0d

2020 → 2026 · PhD era · publications · defense

%%{init: {"theme":"base","themeVariables":{"fontSize":"16px","fontFamily":"Inter, system-ui, -apple-system, sans-serif","gantt":{"sectionFontSize":"18px","taskFontSize":"16px"}},"gantt":{"barHeight":28,"barGap":8,"leftPadding":240,"rightPadding":40,"topPadding":50,"bottomPadding":30,"sectionFontSize":18,"topAxis":true}}}%%
gantt
    title PhD era · 2020 → 2026
    dateFormat YYYY-MM-DD
    axisFormat %b %Y
    tickInterval 6month

    section Early PhD
    ★ Enrolled SNU PhD · Civil Engineering                         :phd, 2021-03-02, 2016d
    Centrifuge programme · 22 tests · KAIST 70 g                   :done, ctr, 2021-06-01, 2024-12-31
    ICPMG 2022 · Daejeon                                           :milestone, 2022-09-20, 0d
    SNU Tennis Tournament · 1st                                    :milestone, 2022-10-15, 0d
    ★ Field monitoring · Gunsan 4.2 MW · 32 months                 :active, field, 2023-05-01, 2026-05-01
    GEOTEC Hanoi 2023                                              :milestone, 2023-11-14, 0d
    SNU Tennis Tournament · 1st                                    :milestone, 2023-10-15, 0d
    ★ Young Scientist Award                                        :milestone, 2023-11-01, 0d

    section Optimization + software
    ★ SNU PhD coursework complete                                  :milestone, 2024-08-31, 0d
    Op³ Monte Carlo ensemble · 1 794 real runs                     :done, mc, 2024-09-01, 2025-04-30
    ★ Blueprint self-optimization protocol                         :active, bp, 2024-10-01, 700d
    Op³ framework · development → PyPI                             :active, op3, 2025-01-15, 2026-07-15
    ★ Op³ v1.0.0-rc2 on PyPI                                       :milestone, 2025-05-01, 0d
    ISFOG 2025 · Nantes                                            :milestone, 2025-06-09, 0d

    section Publications
    J1 · Ocean Engineering (submitted → accepted)                  :done, j1, 2024-10-01, 2025-10-04
    ★ J1 published · first SCIE paper                              :milestone, 2025-10-04, 0d
    J2 · Ocean Engineering submitted                               :milestone, 2026-02-01, 0d
    J3 · Ocean Engineering submitted                               :milestone, 2026-03-17, 0d
    K-Fish · 9-agent LLM swarm launched                            :active, kfish, 2026-04-01, 155d
    ★ Dissertation gap analysis · 1 952-paper synthesis            :milestone, 2026-04-17, 0d
    ★ Research Notes site published                                :milestone, 2026-04-18, 0d
    J2 R2 response due                                             :crit, milestone, 2026-04-29, 0d
    J3 R1 response due                                             :crit, milestone, 2026-05-06, 0d
    Paper V · Engineering Structures submission                    :v, 2026-05-01, 2026-06-15
    Paper B · Comp & Geotech submission                            :b, 2026-05-21, 2026-06-15
    Paper A · RESS submission                                      :a, 2026-07-02, 2026-07-15
    Paper Op³ · AES submission                                     :op3p, 2026-07-02, 2026-07-15

    section Defense
    Dissertation v9 assembly                                       :d9a, 2026-07-16, 14d
    ★ Dissertation v9 freeze                                       :crit, milestone, 2026-08-01, 0d
    Defense slides v1                                              :dsv1, 2026-08-06, 7d
    Defense slides v2 + rehearsal                                  :dsv2, 2026-08-13, 7d
    Dry run with advisor                                           :dryr, 2026-08-20, 7d
    ICPMG 2026 · Zurich                                            :milestone, 2026-09-10, 0d
    🎓 PhD Defense · 2026-09-03                                    :crit, milestone, 2026-09-03, 0d
    GEOTEC Hanoi 2026                                              :milestone, 2026-10-19, 0d

How to read

Symbol Meaning
Active task or programme — length = duration
Completed period
Hard deadline or defense-critical
Milestone — zero-duration event
Critical milestone — external deadline
Significant life event (starred directly in the task label)
🎓 The defense itself

The numbers

Academic

  • IQ


    138

  • High school


    2nd in graduating class

  • SAT


    2240 / 2400 R 680 · M 780 · W 780

  • TOEFL


    115 / 120 R 28 · L 29 · S 28 · W 30

  • Young Scientist Award


    2023 · Seoul National University

Physical

  • Height · weight


    174 cm · 77.0 kg

  • Body composition


    16 % body fat (12.5 kg) · 37.4 kg skeletal muscle InBody score 89

  • Big 3 · 1RM total


    520 kg Bench 140 · Deadlift 200 · Squat 180

  • Conditioning


    10 km run · < 55 min Push-ups · 65 · Pull-ups · 25

Athletics + games

  • Tennis


    SNU Tournament · 1st (2022, 2023) Cal Tennis Club try-out · 8th of 120 (2013) USTA Virginia ranking · #30 (2012) Regency Junior Open Boys 18s · 2nd (2010)

  • Chess


    Rating 2000 (2020)

  • Martial arts


    Oakland Kungfu Academy (2013–2015)

  • Engineering competitions


    ASCE Concrete Canoe · 3rd (2015) Samsung Cup Cal vs Stanford · 3rd (2015) American Math Competitions · 3rd (2011)

Languages + reading

  • Books read


    < 200 by 2016 · < 300 by 2025

  • Papers read


    < 500 by 2023 AI-synthesized · < 1,956 by Apr 2026

  • Vocabulary banks


    SAT vocab · < 2000 memorised Russian words · < 2000 memorised (2020)

  • Wikipedia


    Systematic reading since 2014

Research

  • 22 centrifuge tests


    70 g, KAIST · 5 soil series · 53-channel instrumentation · 1 : 70 scale tripod suction bucket

  • 32 months field data


    4.2 MW Gunsan turbine · 22,616 parked-state windows processed

  • 1,794 Monte Carlo runs


    Op³ pipeline · 3D limit analysis coupled to OpenSees dynamics · Pearson r = 0.989 capacity prediction

  • Op³ framework


    v1.0.0-rc2 on PyPI · 140 tests · 39 benchmarks · CI/CD · standalone Windows executable

  • 4 journal articles


    Published / accepted / under revision + 5 co-author SCI papers + 7 conference proceedings

  • 1,952 papers synthesised


    Hierarchical divide-and-conquer · 45 batch summaries · 5 domain maps · 1 master knowledge map


Ongoing · family business

Myeongil Jack-Up Ocean Co., Ltd. — family-owned offshore vessel and equipment manufacturer. Planned CTO succession provides direct understanding of how engineering decisions translate to marine construction operations, cost structures, and field deployment constraints.


Contact

kyeongsunkim@snu.ac.kr · GitHub · ResearchGate · LinkedIn


Advisor: Prof. Sung-Ryul Kim · SNU Civil & Environmental Engineering